MSBTE Civil Engineering 5th Semester Micro Project Topics & Ideas MSBTE Diploma I Scheme Projects

MSBTE Civil Engineering 5th Semester Micro Project Topics & Ideas MSBTE Diploma I Scheme Projects

MSBTE Civil Engineering 5th Semester Micro Project Topics & Ideas MSBTE Diploma I Scheme Projects 

22501 Water Resources Engineering

1. Prepare a report of cropping pattern, for the given minor or major irrigation project in your area with reference to growth in yield, increase in command and culturable area and economic 

status of the concerned people.

2. Conduct online/internet survey for Watershed management  project (s) in the Maharashtra State 

with a detailed report of all relevant technical inputs.

3. Prepare a report on the executed system of  rain water harvesting with reference to its 

necessity, broad design parameters, economics in your area along with your comments.

4. Summarize the relevant information  in the form of the report from internet regarding types of 

satellite imagery  to capture the necessary details of the given water resource projects.

5. Prepare  a  report  on  the  on  any  one  executed  system  of  Farm  ponds/Jalayukt  shivar 

schemes/drip  irrigation  scheme  with  emphasis  on  its  suitability,  costing,  utility  and 

maintenance after undertaking the visit to it.


22502 Design of Steel and RCC Structures

1. Collect the information of various types of connections  used in actual practice.

2. Enlist  various  software  used  for the design  of steel  structures  and  give  details  

of any one software.

3. Enlist  various Software  used  for the design of RCC structures  and  give details  of  any 

one software.

4. Procure actual  working drawing / blue print of structural  design  and  write report  after 

checking actual reinforcement  placed at site.

5. Collect the details of various types of the formwork  used for RCC structures at site.

6. Collect the details of safety  norms followed during RCC construction  at site and write a 

report.

7. Collect the details of safety  norms followed  during Steel construction  at site and write 

a report

8. Visit  the  site  and  study  the  labor  management  for  any  one  activity  related  to  

RCC component and write a report.

9. Visit  the site and  study the material  management  for any  one activity  related  to RCC 

component and write a report.


22503 Estimating and Costing

1. Compare  the  two  detailed  estimates  collected  from  professionals  along  with  your 

comments in the form of a report.

2. Prepare  approximate  estimate  of  various  types  of  building  such  as  school  

building, hospital,  auditorium,  Hostel,  irrigation  project,  bridge  in  the  immediate  

vicinity  of your area.

3. Prepare detailed estimate of any load  bearing structure using available software. d      

Prepare detailed estimate of the fulfilled structure using available software.

4. Prepare  rate analysis of Planting  work  using  OBD,  PlñStlc  emulsion,  Oil paint,  

luster paint.

5. Prepare detailed estimate for the proposed new Biturninous Road of l km length.

6. Prepare detailed estimate for the construction  of Slab Culvert.

7. Prepare detailed estimate for the construction  of Pipe Culvert.

8. Prepare estimate for Renovation  of an existing building (any five items). Prepare  Rate analysis  using CSR/DSR  (Current/District   Schedule  of Rates) Items by PWD Methods  (Any  Five items)

9. Prepare  the report on the salient  provisions  made in IS:1200 with special  reference to 

load bearing structure.

 

22504 Public Health Engineering

1. Test the water sample from locally available area to determine its characteristics..

2. Test the waste water sample from locally available area to determine its characteristics Suggest  the  remedial  measures  for  the  control  of  pollution  of  local  water  source  by conduct relevant study and tests.

3. Visit   the   site   where   Utilization   and   recycling   of   treated    wastewater.is   being implemented  and prepare a detail report on it.

4. Undertake the Impact study of vehicular pollution on environment.

5. Undertake  a comparative  study  of  Solar  water  heater  project  and  conventional  water heater 

project for residential building.



22505 Rural Development  (Elective).

1. Prepare  a  report  on  implementation  of  Prime  Minister  Rural  Development  Fellows 

5cheine for the nearby Village after undertaking  the visit to that village.

2. Collect  the  detailed  information  on  Pradhan  Mantri  Gram  Sadak  Yojana  (PMGSY) that 

has been executed successfully for the given rural area and present the same in the four of the report.

3. Sriiriiiarize  the  salient  features  of  the  National  Rural  Employment   Guarantee  Act, 

2005  (NREGA)  that  has  been  executed  successfully  for  the  given  rural  area  and present 

the same in the form of the report.

4. Prepare  the  report  on  the  executed  scheme  under  the  banner  of  “Swarnjayanti  Gram 

Swarozgar  Yojana (SGS Y)” to assist the poor families living below the proven line in the given 

rural  areas for taking up self employment.

5. Prepare  the  report  on  the  executed  scheme  under  the  banner  of,  “The  Sampoorna 

Grameen  Rozgur  Yojna”  to  provide  additional  wage  employment  in  the  given  rural areas 

with its impact on food security, improvement in nutritional levels.

6. Analyze  the  E-Book  released  by  the  Ministry  of  Rural  Development   downloaded through internet with special reference to its initiatives and achievements.

7. Collect the information of, “Deen Dayal Upadhyaya  Grameen Kaushalya  Yojana”  and prepare a 

report on it with reference to the nearby village or rural settlement.

8. Visit to - Ralegan Siddhi, Hiware Bazar, Chitrakut, Vanrai and prepare a report on it.


222507 Traffic Engineering (Elective)

a.     Prepare a model of traffic controlling devices.

b.     Make posters showing traffic safety and awareness.

c.     Perform traffic survey of busy road junction of city in groups and to suggest measures for  improvement.

d.     Prepare a report on advanced road marking machinery and materials.

e.     Undertake the process of planting, protecting and maintaining the trees along the road.

f.     Prepare the charts showing different types of road signs.



MSBTE Diploma All Branch Project Ideas

MSSBTE has suggested small projects in MSBTE I scheme. A student plans to undertake only one micro-project which should be assigned to him at the beginning of the semester. The first four semesters are group-based micro-projects. However, in the fifth and sixth semesters, the problem-solving skills and confidence of each student should be taken as individually as possible so that he can contribute to the projects of the industry. In some situations where groups have to be formed for small-scale projects, the number of students in the group should not exceed three.

Area of Projects Micro-projects can be industry-based, Internet-based, workshop-based, laboratory-based, or field-based. Each micro-project should include two or more COs which are actually a combination of Pro, UO and ADO. Each student must keep a dated work diary of personal contributions to the project work and present his / her seminar before submitting it.

MSBTE Diploma All Branch Projects:

  1. Computer Engineering 
  2. Information Technology 
  3. Civil Engineering 
  4. Electrical Engineering
  5. Mechanical Engineering  
  6. Electronic Engineering

  1.  You can suggest us projects please let us know in our comment section.
  2. Format is  1.Name: ******* 2.Branch: ******* 3.Semester: ****** 4.Project Topic: *****

Post a Comment

Previous Post Next Post